There are a plenty of sustainability and efficiency benefits to SIP Panel construction that we have outlined in our previous tandem house 1 blog post. After living in a SIP house for 3 years we can attest that the savings in energy bills and the health benefits to our family seem like good enough justification for this progressive building practice. But perhaps even stronger arguments are the strength as well as the speed and ease of construction. When installation week arrived for Tandem House 1 it was exciting and it was no different with Tandem House 2. The SIPs arrived on-site in early December and were installed in 10-days (including the roof).
A SIP install timelapse is a must so here you go!