The landscape site work is definitely an orchestrated process that has many phases to follow. The images below give you a sense of where the site stands and we’ll continue to show the evolution. The site work to date is outlined below:
- Demolish the existing porch and awning
- Excavate and form a retaining wall between the front and back house
- Install a new electrical panel and meter box on the existing house and bury the overhead utilities
- Layout and build formwork for concrete path and stairs that will connect from the City sidewalk to the new house
- Plant Trees (14, Skyrocket Junipers). The evergreen trees will grow to form a 20′ privacy wall between the front and back house
Existing Awning
Demo Existing Awning
Demo Existing Awning
Demo Existing Awning
Demo Existing Awning
Porch Without Awning
Demo Existing Porch
Demo Existing Porch
Demo Existing Porch
Excavate to Prep for Retaining Wall
Formwork for Retaining Wall
Pouring Concrete Foot for Retaining Wall
Concrete Footing
Prepping for Retaining Wall to be Poured on top of Footing
New Electrical Panel and Meter Box
Digging Trench to House Utilities
Utility Trench
Utility Trench
Formwork for Concrete Path
Formwork for Stairs
Formwork for Stairs
Formwork for Stairs
Formwork for Concrete Path
Formwork for Concrete Path
14 Skyrocket Junipers
Prepping to Plant Trees
Dug Holes
Planting Trees
Planted Trees
Planted Trees